if you get often a message
<BEA-310006> <Critical subsystem JTAMigratableGroup has failed. Setting server state to FAILED.
Reason: JTA migratable target lost a lease>
you might consider tuning these 2 parameters in confix.xml:
database-leasing-basis-connection-retry-count
"The maximum number of times Database Leasing will try to obtain a valid
connection from the Data Source.
(Interface=weblogic.management.configuration.ClusterMBean Attribute=getDatabaseLeasingBasisConnectionRetryCount)"
Default 1
database-leasing-basis-connection-retry-delay
The length of time, in milliseconds,Database Leasing will wait before
attempting to obtain a new connection from the Data Source when a connection
has failed.
(Interface=weblogic.management.configuration.ClusterMBean Attribute=getDatabaseLeasingBasisConnectionRetryDelay)
Default 1000 (millis)
Friday, May 19, 2017
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment